User manual Allied Telesis Switch X900-24XS

If you found this page, you probably have a problem and you need a user manual for the device Allied Telesis Switch X900-24XS. Be sure to check that it is the user manual to exactly the device that you are looking for. In our database Allied Telesis Switch X900-24XS it belongs to the category Switch. A user manualAllied Telesis Switch X900-24XS is taken from the manufacturer, a Allied Telesis company - it is an official document, so if you have any doubts as to its contents, please contact the manufacturer of the device Allied Telesis Switch X900-24XS directly. You can view the user manualAllied Telesis Switch X900-24XS directly online or save and store it on your computer.

Installation and Safety Guide  
Installing the Switch  
Ports on the switch are suitable only for connections within buildings (intra-  
building) and with cables unexposed to the outside.  
You can install the switch on a level surface, such as a desktop or bench, or in a  
standard 19-inch rack. Some switches are heavier at the rear than at the front.  
Use the brackets supplied with the switch when rack-mounting because they are  
designed to fully support the weight.  
Before you begin  
Read the safety information.  
For your well-being and that of the equipment, read the safety information in  
this document. You can also download this document from  
www.alliedtelesis.com/support/software.  
Verify the package contents if you have not already done so.  
See “Package Contents” on page 4. If any items are damaged or missing,  
contact your authorised distributor or reseller.  
Gather necessary tools and equipment:  
Phillips #2 screwdriver to loosen the blanking plate, if any.  
Rack-mount screws and nuts, and a suitable screwdriver. The  
SwitchBlade x908 requires eight sets of screws and nuts. All other  
switches required four sets.  
For DC installations, you need an appropriate DC power source, DC  
supply cable, ring connectors, and a crimp tool for screw terminal style  
connectors or appropriate connectors for the PSU model.  
Prepare the cabinet in a suitable location  
Follow guidelines described in “Selecting a Site” on page 6 to choose an  
appropriate location and modify the rack as necessary.  
Because the switch is deep, we recommend two people mount the switch in  
the rack and tighten the screws.  
Preparation for NEBS  
For Network Equipment Building System (NEBS) installations of the x900-24XT-N,  
do the following to ensure rack-mounted installations are earthed:  
Remove non-conductive coatings, such as lacquer and enamel, from the rack  
rail where hardware will contact it. Remove coatings from unplated  
connectors, braided strap, and bus bars, and bring them to a bright finish.  
Coat them with an antioxidant before connecting them. During installation,  
thread-forming screws with star washers may be used for this purpose.  
7

In addition to the user manual Allied Telesis Switch X900-24XS, we also provide a support panel to help you solve your problems with Allied Telesis Switch X900-24XS. If you have any questions, you can ask them in the form below. Other users viewing this website will have the opportunity to help you solve your probem with Allied Telesis Switch X900-24XS. Remember that you can also share the solution. If you solved the problem yourself, please write the solution to the problem with Allied Telesis Switch X900-24XS - you will surely help many users by doing so.

Have you got problems with your device? Ask a question - our users can help you

No one has added a comment for this device/ user manual.